Oriental Rail Infrastructure received a Ministry of Railways order to manufacture and supply 1,560 BOXNS wagons. The order is valued at about ₹630.61 Crore, inclusive of GST.
Value
₹630.6 Cr
From
Ministry of Railways (Railway Board), Indian Railways
Execution
Delivery period for the additional 360 BOXNS wagons up to June 11, 2027; the core 1,560-wagon supply period is not separately stated
Oriental Rail Infrastructure secured a Rs. 4.76 Crore order from Integral Coach Factory for manufacturing and supplying 50 coach sets of seats and berths.
Value
₹4.76 Cr
From
Integral Coach Factory (ICF), Chennai, Indian Railways
Oriental Rail Infrastructure Limited has secured a Rs. 1.65 Crore order from Modern Coach Factory, Raebareli. The contract involves manufacturing 26 sets of seats for LHB GS coaches.
Value
₹1.65 Cr
From
Modern Coach Factory (MCF), Raebareli, Indian Railways
Oriental Rail Infrastructure received a Rs.3.64 Crore order from ICF, Chennai (Indian Railways) for 40 coach-chair sets. Delivery due by November 2026.
Value
₹3.64 Cr
From
Integral Coach Factory (ICF), Chennai, Indian Railways
Oriental Rail Infrastructure secured a Rs.5.85 Crore order from MCF Raebareli, Indian Railways for 54 sets of LHB Non-AC Chair Car seats. Delivery is due by January 10, 2027.
Value
₹5.85 Cr
From
Modern Coach Factory (MCF), Raebareli, Indian Railways
Oriental Rail Infrastructure Limited has secured a Rs. 1.76 Crore order from Integral Coach Factory, Chennai. The contract involves manufacturing and installing coach seats by November 2026.
Oriental Rail Infrastructure won a contract from Modern Coach Factory worth ₹5.26 Crore. The project involves manufacturing 78-seater LHB coach seating.
Oriental Rail Infrastructure secured a Rs. 1.62 Crore order from Integral Coach Factory. The project involving 15 seat sets concludes by September 2026.
Oriental Rail Infrastructure secured a ₹3.95 Crore order from Integral Coach Factory for LWS PP Coach seats and berths. The project must be executed by August 2026.