Oriental Rail Infrastructure received a Ministry of Railways order to manufacture and supply 1,560 BOXNS wagons. The order is valued at about ₹630.61 Crore, inclusive of GST.
Value
₹630.6 Cr
From
Ministry of Railways (Railway Board), Indian Railways
Execution
Delivery period for the additional 360 BOXNS wagons up to June 11, 2027; the core 1,560-wagon supply period is not separately stated
Oriental Rail Infrastructure secured a Rs. 4.76 Crore order from Integral Coach Factory for manufacturing and supplying 50 coach sets of seats and berths.
Value
₹4.76 Cr
From
Integral Coach Factory (ICF), Chennai, Indian Railways
Oriental Rail Infrastructure Limited has secured a Rs. 1.65 Crore order from Modern Coach Factory, Raebareli. The contract involves manufacturing 26 sets of seats for LHB GS coaches.
Value
₹1.65 Cr
From
Modern Coach Factory (MCF), Raebareli, Indian Railways
Oriental Rail Infrastructure received a Rs.3.64 Crore order from ICF, Chennai (Indian Railways) for 40 coach-chair sets. Delivery due by November 2026.
Value
₹3.64 Cr
From
Integral Coach Factory (ICF), Chennai, Indian Railways
Oriental Rail Infrastructure secured a Rs.5.85 Crore order from MCF Raebareli, Indian Railways for 54 sets of LHB Non-AC Chair Car seats. Delivery is due by January 10, 2027.
Value
₹5.85 Cr
From
Modern Coach Factory (MCF), Raebareli, Indian Railways
Oriental Rail Infrastructure Limited has secured a Rs. 1.76 Crore order from Integral Coach Factory, Chennai. The contract involves manufacturing and installing coach seats by November 2026.
Oriental Rail Infrastructure won a contract from Modern Coach Factory worth ₹5.26 Crore. The project involves manufacturing 78-seater LHB coach seating.
Oriental Rail Infrastructure secured a Rs. 1.62 Crore order from Integral Coach Factory. The project involving 15 seat sets concludes by September 2026.
Oriental Rail Infrastructure secured a ₹3.95 Crore order from Integral Coach Factory for LWS PP Coach seats and berths. The project must be executed by August 2026.
Oriental Rail Infrastructure Limited has secured a ₹1.57 Crore order from Rail Coach Factory, Kapurthala. The contract involves manufacturing, supplying, and installing 25 sets of seats and berths for LHB GS coaches. The order is scheduled for execution by September 28, 2026.