Oriental Rail's joint venture ABOR Projects LLP received a Letter of Acceptance worth Rs. 44.19 Crore from Central Railway Loco Workshop, Parel. The turnkey refurbishment of 75 LHB coaches must be completed within 18 months.
Oriental Rail Infrastructure received an India Ratings assignment of IND BBB+/Stable on its Rs.35 Crore bank loan facilities. The rating reflects the company's current creditworthiness.
Oriental Rail's subsidiary Oriental Foundry had a fire at its Kutch plant on 28 October 2026. Damage is minimal, operations are unaffected and the loss is insured.
Oriental Rail Infrastructure received a Ministry of Railways order to manufacture and supply 1,560 BOXNS wagons. The order is valued at about ₹630.61 Crore, inclusive of GST.
Value
₹630.6 Cr
From
Ministry of Railways (Railway Board), Indian Railways
Execution
Delivery period for the additional 360 BOXNS wagons up to June 11, 2027; the core 1,560-wagon supply period is not separately stated
Oriental Rail reported robust Q2FY27 performance with 29% YoY revenue growth and 44% YoY PAT growth, driven by improved order execution in the wagon business.
Oriental Rail Infrastructure secured a Rs. 4.76 Crore order from Integral Coach Factory for manufacturing and supplying 50 coach sets of seats and berths.
Value
₹4.76 Cr
From
Integral Coach Factory (ICF), Chennai, Indian Railways
Oriental Rail Infrastructure Limited has secured a Rs. 1.65 Crore order from Modern Coach Factory, Raebareli. The contract involves manufacturing 26 sets of seats for LHB GS coaches.
Value
₹1.65 Cr
From
Modern Coach Factory (MCF), Raebareli, Indian Railways
Oriental Rail Infrastructure received a Rs.3.64 Crore order from ICF, Chennai (Indian Railways) for 40 coach-chair sets. Delivery due by November 2026.
Value
₹3.64 Cr
From
Integral Coach Factory (ICF), Chennai, Indian Railways
Oriental Rail Infrastructure secured a Rs.5.85 Crore order from MCF Raebareli, Indian Railways for 54 sets of LHB Non-AC Chair Car seats. Delivery is due by January 10, 2027.
Value
₹5.85 Cr
From
Modern Coach Factory (MCF), Raebareli, Indian Railways
Oriental Rail Infrastructure Limited held its 35th Annual General Meeting on September 8, 2026, transacting business including director appointments and adoption of financial statements.
Oriental Rail Infrastructure Ltd, via its subsidiary, signed a Technology Development Agreement with Russia's VNICTT. The collaboration focuses on designing 25-tonne axle-load bogies and solid-bottom gondola cars.
Oriental Rail Infrastructure Limited has secured a Rs. 1.76 Crore order from Integral Coach Factory, Chennai. The contract involves manufacturing and installing coach seats by November 2026.
Oriental Rail reported strong Q1FY27 performance with 17% revenue growth and significant margin expansion driven by a superior product mix and operating leverage in the wagon segment.
Oriental Rail Infrastructure submitted a Monitoring Agency Report for the quarter ended June 30, 2026. The report monitors the utilization of preferential issue proceeds.