Tata Power Renewable Energy Limited commissioned 419 MW of utility-scale projects and 131.2 MWh of battery storage in Q2 FY27. Total operational capacity reached 7.2 GW.
- renewable energy capacity
- 419.0 MW
ALFA Filings
Every announcement, straight from the exchange
Every Tata Power Company production started announcement on NSE and BSE, newest first, each with its own page.
Time
4 announcements with these filters
Tata Power Renewable Energy Limited commissioned 419 MW of utility-scale projects and 131.2 MWh of battery storage in Q2 FY27. Total operational capacity reached 7.2 GW.
Tata Power Renewable Energy Limited commissioned a 190.5 MW Solar FDRE project in Rajasthan. This project includes a 115 MWHr battery energy storage system for grid reliability.
Tata Power has commenced commercial operations of its 100.8 MW Jewali Wind Project. The project is valued at ₹925.30 crore.
Tata Power Renewable Energy Ltd has commissioned its 100.8 MW Jewali Wind Project in Maharashtra. The wind farm will generate ~299 million kWh annually, offsetting 245 million kg of CO₂.