BSE filing, NSE: JSWINFRA. Summary written from the filing by ALFA Finder's alert engine.
JSW Infrastructure Ltd: key numbers
- Share price
- ₹314.80
- Market cap
- ₹73,348 Cr
- Revenue (annual)
- ₹5,361 Cr
- Net profit (annual)
- ₹1,523 Cr
- P/E (TTM)
- 50.9×Sector 29.6×
- Promoter holding
- 73.93%+0.00% QoQ
- FII holding
- 12.48%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from JSW Infrastructure Ltd
All →JSW Infrastructure Earnings Call Transcript: Key Takeaways
JSW Infrastructure delivered healthy revenue growth of 18% YoY despite geopolitical disruptions in Fujairah.
JSW Infrastructure Other Announcement
JSW Infrastructure's monitoring agency reports no deviation from IPO objects this quarter. Financing capex objects are delayed against offer-document timelines.
JSW Infrastructure Investor Presentation: Key Takeaways
Q2 FY27 consolidated revenue ₹1,481 Cr (+17% YoY), operating EBITDA ₹674 Cr (45.5% margin, +11%), PAT ₹328 Cr (down 11%). H1 revenue ₹2,926 Cr (+18%). Logistics scaling via Navkar and GCT.
- Call
- Guides 23% growth
JSW Infrastructure Results Update
JSW Infrastructure's media release reports Q2 FY2027 revenue up 17% to Rs 1,481 Crore. PAT fell to Rs 328 Crore, hit by unrealised forex losses.
JSW Infrastructure Q2 FY27 Results: Net Profit ₹328.2 Cr, Down 11.0% YoY
JSW Infrastructure Ltd reported revenue from operations of ₹1,481 Cr (+17.0% YoY) and net profit of ₹328.2 Cr (-11.0% YoY) for Q2 FY27.
- Key figure
- Net profit ₹328.2 Cr · -11.0% YoY
JSW Infrastructure Other Announcement
JSW Infrastructure Ltd filed its quarterly shareholding pattern for the period ended September 30, 2026. The filing discloses promoter and public shareholding details.
Other production started announcements
All →EPack Prefab Technologies Production Started
EPACK Prefab commenced commercial production at its Ghiloth, Rajasthan facility effective October 28, 2026, adding 11,300 MT/annum of PEB capacity and 8,00,000 sq m/annum of PUF capacity. The project cost of around INR 100 Crore is not treated as an event value.
- PEB structures manufacturing capacity
- 11300.0 MT/annum
Zelio E-Mobility Production Started
Zelio E-Mobility began commercial production at its new Patan, Hisar plant on October 28, 2026. The plant adds 72,000 annual units of two- and three-wheeler capacity.
- manufacturing capacity (two- and three-wheelers)
- 72000.0 units per annum
Subros Production Started
Subros started commercial production at its new Kharkhoda greenfield plant on 28 October 2026. The plant adds 4.5 lakh units per annum of HVAC and hose capacity.
- HVAC and hose & tubes manufacturing capacity
- 4.5 lakh units per annum
ACME Solar Holdings Production Started
ACME Solar's subsidiary commissioned 35.77 MW/143.08 MWh of BESS capacity, bringing cumulative commissioned capacity to 195.35 MW/781.40 MWh. Commercial operation is scheduled for October 29, 2026.
- BESS discharge capacity commissioned
- 35.77 MW
Kalana Ispat Production Started
Kalana Ispat has commenced commercial production of alloy steel round bars at its new Khengaria rolling mill. The mill has an annual capacity of about 65,000 MT.
- alloy steel rolling mill capacity
- 0.065 MTPA
Jainik Power Cables Production Started
Jainik Power Cables commissioned a 400 kW solar plant at its Sonipat facility in October 2026. The installation supports energy efficiency and its ESR sustainability commitments.
- solar power plant capacity
- 400 kW