Interarch Building Solutions received a ~₹59 Crore order for a Pre-Engineered Steel Building in South India. Execution is approximately 10 months with 25% advance payment terms.
Interarch received a Rs.61 Crore order for a Pre-Engineered Steel Building System for a Copper Refinery in Gujarat. Delivery is expected within 12 months with 20% advance.
Interarch Building Solutions secured an order for Pre-Engineered Steel Building systems worth approximately ₹89 Crore. The project is to be executed in about 10 months.
Interarch Building Solutions secured a ₹128 Crore order from a major FMCG player. The project spans design, engineering, and supply over a 10-month period.
Interarch Building Solutions secured a Rs. 83 Crore order for a major energy transmission project. The contract involves design and manufacturing with a 16-month execution timeline.