DMR Engineering received an assignment from Studio Ing. G. Pietrangeli Srl for ADB/DPN Nagaland consultancy services. Contract value is USD 216,000 (~₹2.05 Crore) over 12 months.
DMR Engineering received a Rs.70 Crore LoA from Arun Shakti Energy for the 24.60 MW Kamlang Hydro Project in Arunachal Pradesh. The contract spans 780 days.
DMR Engineering Limited secured a USD 200,000 engineering consultancy contract from Ta Dam Energy Consulting. The hydropower project in Lao PDR will be executed over 12 months.
DMR Engineering Limited secured a Rs. 1.66 Crore contract from Power Finance Corporation for project management services on the 1500MW Tarali Pumped Storage Project.
DMR Engineering secured a ₹2.59 Crore work order for the 1125MW Dorjilung Hydropower Project in Bhutan. The consultancy contract will be executed over nine months.
DMR Engineering secured a ₹1.80 Crore consultancy contract for the Wangchhu Hydropower Project in Bhutan. The international work order has an eight-month execution timeline.