Brahmaputra Infrastructure declared L-1 for a Rs. 89.73 Crore bridge project over River Ravi in Punjab. Execution period is 24 months under the CRIF Scheme.
Value
₹89.73 Cr
From
Office of the Executive Engineer, Construction Division, PWD B&R Branch, Pathankot
Brahmaputra Infrastructure signed a Rs.46.63 Crore contract with Northeast Frontier Railway for a Road Over Bridge. Work deadline is August 2027 with a 48-month defect liability period.
Value
₹46.63 Cr
From
Northeast Frontier Railway (Ministry of Railways, Government of India)
Execution
On or before 08.08.2027, plus 48-month defect liability period