23:29 IST
BSE
Production Started
ACME Solar Holdings Production Started
ACME Solar Holdings commissioned Phase-I of its solar power project in Rajasthan. The 66.68 MW capacity reached commercial operation on September 14, 2026.
- solar power capacity
- 66.68 MW