| Value | ₹2.26 Cr |
|---|---|
| Execution period | on or before October 31, 2026 |
BSE filing, NSE: RELICAB. Summary written from the filing by ALFA Finder's alert engine.
Relicab Cable Manufacturing Ltd: key numbers
- Share price
- ₹34.00
- Market cap
- ₹34.32 Cr
- Revenue (annual)
- ₹64.21 Cr
- Net profit (annual)
- ₹1.90 Cr
- P/E (TTM)
- 19.3×Sector 42.1×
- Promoter holding
- 27.95%+0.00% QoQ
- FII holding
- 0.00%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Relicab Cable Manufacturing Ltd
All →Relicab Cable Manufacturing Other Announcement
Relicab Cable Manufacturing Ltd has filed its quarterly shareholding pattern for the period ended September 30, 2026, as required under SEBI regulations.
Relicab Cable Manufacturing Management Change
Relicab Cable Manufacturing Ltd appointed Mr. Suhir Shah as Managing Director for a three-year term effective September 11, 2027.
Relicab Cable Manufacturing Annual General Meeting
Relicab Cable Manufacturing Ltd held its 17th Annual General Meeting on September 30, 2026, to conduct routine business including financial statement approval and director appointments.
Relicab Cable Manufacturing Capital Structure Change
Aryaman Capital Markets acquired 6,435 shares of Relicab Cable in open market, crossing the 2% SAST threshold. Holdings rose from 6.28% to 8.32%. No transaction price disclosed.
Relicab Cable Manufacturing Bags ₹0.95 Cr Order from One of the world's leading Cable manufacturing companies
Relicab Cable Manufacturing Ltd has received a contract to supply Copper Conductor. The order is valued at approximately Rs. 0.95 Crore.
- Value
- ₹0.95 Cr
- From
- One of the world's leading Cable manufacturing companies
- Execution
- On or before September 30, 2026
Relicab Cable Manufacturing Adverse Business Impact
Relicab Cable disclosed a burglary at its Daman factory with estimated losses of ₹0.44 Crore. Assets are adequately insured and claims are being filed.
- Value
- ₹0.44 Cr
Other new order win announcements
All →RailTel Corporation of India Bags ₹22.78 Cr Order from Department Of Posts
RailTel received a Letter of Acceptance from Department of Posts for GPU Compute and Storage services. The Rs. 22.78 Crore order covers a 5-year OPEX execution period.
- Value
- ₹22.78 Cr
- From
- Department Of Posts
- Execution
- 5 years
Dilip Buildcon Bags ₹688.2 Cr Order from National Highways Authority of India
Dilip Buildcon received a Rs. 688.23 Crore LOA from NHAI for a 9.66 km Solapur elevated corridor. Construction spans 24 months with a 15-year operation period.
- Value
- ₹688.2 Cr
- From
- National Highways Authority of India
- Execution
- 24 Months (construction) + 15 years (operation from COD)
- elevated corridor length
- 9.66 km
Jupiter Wagons Bags ₹1,140 Cr Order from Ministry of Railways
Jupiter Wagons secured an order for 2,583 BOXNHL and BOXNS wagons worth ₹1,140 crore from the Ministry of Railways. This reinforces its position in railway rolling stock manufacturing.
- Value
- ₹1,140 Cr
- From
- Ministry of Railways (Railway Board)
ACME Solar Holdings Bags New Order from NTPC Limited
ACME Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project. Supply is scheduled to start by June 2028, with a 25-year tenure.
- From
- NTPC Limited
- Execution
- Scheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD
- FDRE power project contracted capacity
- 400.0 MW
Zaggle Prepaid Ocean Services Bags New Order from AGP City Gas Private Limited
Zaggle Prepaid Ocean Services will provide its Zaggle Propel platform to AGP City Gas under a one-year agreement. Fees depend on active users and redeemed vouchers, so no contract value is disclosed.
- From
- AGP City Gas Private Limited
- Execution
- 1 year
Vascon Engineers Bags ₹72 Cr Order from Neobridge Realty LLP
Vascon Engineers received a Letter of Intent worth Rs.72 Crore from Neobridge Realty LLP. The 25-month construction contract covers the Astoria residential project in Bandra, Mumbai.
- Value
- ₹72.00 Cr
- From
- Neobridge Realty LLP
- Execution
- 25 months