| solar power capacity | 1.2 MW |
|---|
NSE filing, NSE: GALAPREC. Summary written from the filing by ALFA Finder's alert engine.
Gala Precision Engineering Ltd: key numbers
- Share price
- ₹1,038.80
- Market cap
- ₹1,331 Cr
- Revenue (annual)
- ₹314.3 Cr
- Net profit (annual)
- ₹35.48 Cr
- P/E (TTM)
- 35.9×Sector 51.5×
- Promoter holding
- 54.25%-0.09% QoQ
- FII holding
- 1.26%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Gala Precision Engineering Ltd
All →Gala Precision Engineering Board Meeting Date
Gala Precision Engineering schedules a November 5, 2026 board meeting to consider unaudited Q2 FY27 results. Trading window stays closed from October 1 until November 7.
Gala Precision Engineering Other Announcement
Gala Precision Engineering Ltd submitted its quarterly shareholding pattern for the period ended September 30, 2026, as required under SEBI regulations.
Gala Precision Engineering Other Announcement
KMP Satish Kotwani sold 1,000 shares of Gala Precision Engineering worth ₹0.12 Crore via a market transaction.
- Value
- ₹0.12 Cr
Gala Precision Engineering Legal & Regulatory
Gala Precision Engineering announced the conclusion of Income Tax proceedings at its premises. The company confirms that operations continued normally with no material impact.
Gala Precision Engineering ED Probe / Tax Survey
Gala Precision Engineering disclosed that Income Tax Department officials commenced proceedings at the company's registered office and the promoter's residence. Business operations remain unaffected.
Gala Precision Engineering Earnings Call Transcript: Key Takeaways
Gala Precision Engineering reported Q1 FY27 revenue of INR 75 crores (up 20% YoY) and EBITDA of INR 12 crores (up 28% YoY) driven by strong growth in Disc Springs and Fasteners.
- Call
- Guides 25% growth
Other production started announcements
All →Waaree Energies Production Started
Waaree Solar Americas commenced commercial production of 1.6 GW solar modules at Brookshire, Texas. Total facility capacity now stands at 3.2 GW.
- solar module manufacturing capacity
- 1600 MW
Studds Accessories Production Started
Studds Accessories commenced commercial production at its Manufacturing Facility-V in Faridabad on October 30, 2026, after receiving Consent to Operate. No capacity or monetary value was disclosed.
NTPC Green Energy Production Started
NTPC Green Energy's subsidiary declared commercial operations for 95.6 MW of its Kalasar Solar Energy Project effective October 30, 2026.
- solar capacity
- 95.6 MW
NTPC Production Started
NTPC's subsidiary NVVN declared its first 250 MW / 500 MWh BESS project commercial from 27 October 2026, with power scheduling starting 28 October. This is a commercial operation start for a new energy storage asset.
- battery energy storage capacity
- 250.0 MW
DCM Shriram Production Started
DCM Shriram announced full commissioning of its ~68 MW wind-solar hybrid renewable power project. The project is held through SPV JSW Renew Energy Thirty Two Limited.
- wind-solar hybrid renewable power capacity
- 68.0 MW
Subros Production Started
Subros commenced commercial production at its new greenfield HVAC and Hose & Tubes plant. The 4.5 lakh units/annum capacity required ₹150 Crore investment.
- Value
- ₹150.0 Cr
- HVAC and Hose & Tubes / air-conditioning system production capacity
- 450000 units per annum