| Value | ₹1,368 Cr |
|---|
BSE filing, NSE: GRINFRA. Summary written from the filing by ALFA Finder's alert engine.
G R Infraprojects Ltd: key numbers
- Share price
- ₹754.85
- Market cap
- ₹7,304 Cr
- Revenue (annual)
- ₹8,399 Cr
- Net profit (annual)
- ₹902.8 Cr
- P/E (TTM)
- 7.2×Sector 32.2×
- Promoter holding
- 74.69%+0.00% QoQ
- FII holding
- 2.30%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from G R Infraprojects Ltd
All →G R Infraprojects Board Meeting Date
G R Infraprojects will hold a board meeting on November 4, 2026 to consider unaudited standalone and consolidated results for the quarter and half year ended September 30, 2026. This is advance notice of a future meeting.
G R Infraprojects Other Announcement
G R Infraprojects Ltd filed its quarterly shareholding pattern for the period ended September 30, 2026, as required under SEBI regulations.
G R Infraprojects Legal & Regulatory
G R Infraprojects announced that the Hon'ble High Court of Madhya Pradesh has quashed the GST Show Cause Notice previously received by the Company.
G R Infraprojects Bags ₹91.6 Cr Order from Varanasi MMLP Limited
GR Infraprojects' subsidiary signed a Rs.91.60 Crore DBFOT concession agreement with Varanasi MMLP Limited for MMLP Varanasi development. Concession period is 45 years with 1-year construction.
- Value
- ₹91.60 Cr
- From
- Varanasi MMLP Limited
- Execution
- Construction: 1 year; Concession: 45 years from appointed date
G R Infraprojects Management Change
G R Infraprojects has designated Mr. Archit Agarwal and Mr. Bharat Bhushan Aggarwal as Senior Management Personnel, effective October 14, 2026.
G R Infraprojects Legal & Regulatory
G R Infraprojects Limited has filed a writ petition before the High Court of Madhya Pradesh. The petition challenges a GST show cause notice received from the State Tax department.
Other production started announcements
All →Waaree Energies Production Started
Waaree Solar Americas commenced commercial production of 1.6 GW solar modules at Brookshire, Texas. Total facility capacity now stands at 3.2 GW.
- solar module manufacturing capacity
- 1600 MW
Studds Accessories Production Started
Studds Accessories commenced commercial production at its Manufacturing Facility-V in Faridabad on October 30, 2026, after receiving Consent to Operate. No capacity or monetary value was disclosed.
NTPC Green Energy Production Started
NTPC Green Energy's subsidiary declared commercial operations for 95.6 MW of its Kalasar Solar Energy Project effective October 30, 2026.
- solar capacity
- 95.6 MW
NTPC Production Started
NTPC's subsidiary NVVN declared its first 250 MW / 500 MWh BESS project commercial from 27 October 2026, with power scheduling starting 28 October. This is a commercial operation start for a new energy storage asset.
- battery energy storage capacity
- 250.0 MW
DCM Shriram Production Started
DCM Shriram announced full commissioning of its ~68 MW wind-solar hybrid renewable power project. The project is held through SPV JSW Renew Energy Thirty Two Limited.
- wind-solar hybrid renewable power capacity
- 68.0 MW
Subros Production Started
Subros commenced commercial production at its new greenfield HVAC and Hose & Tubes plant. The 4.5 lakh units/annum capacity required ₹150 Crore investment.
- Value
- ₹150.0 Cr
- HVAC and Hose & Tubes / air-conditioning system production capacity
- 450000 units per annum