BSE filing, BSE: 544387. Summary written from the filing by ALFA Finder's alert engine.
Desco Infratech Ltd: key numbers
- Share price
- ₹182.25
- Market cap
- ₹139.9 Cr
- Revenue (annual)
- ₹118.6 Cr
- Net profit (annual)
- ₹16.35 Cr
- P/E (TTM)
- 8.6×Sector 32.2×
- Promoter holding
- 58.31%
- FII holding
- 0.00%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Desco Infratech Ltd
All →Desco Infratech Other Announcement
Desco Infratech Ltd has filed its quarterly shareholding pattern for the period ended September 30, 2026, pursuant to SEBI Listing Regulations.
Desco Infratech Annual General Meeting
Desco Infratech Limited announced voting results for its adjourned 15th AGM held on October 7, 2026. Shareholders approved all twelve resolutions including financial statements and director re-appointments.
Desco Infratech Management Change
Desco Infratech's shareholders approved the regularization of Mr. Shailesh Kalidas Naik as an Independent Director for a five-year term at the adjourned Annual General Meeting.
Desco Infratech Annual General Meeting
Desco Infratech adjourned its 15th Annual General Meeting due to lack of quorum. The meeting will reconvene on 7th October 2026.
Desco Infratech Bags ₹2.34 Cr Order from Adani Total Gas Limited
Desco Infratech received a Rs. 2.34 Crore order from Adani Total Gas for MDPE pipeline laying at Navsari. The award strengthens its gas pipeline order book.
- Value
- ₹2.34 Cr
- From
- Adani Total Gas Limited (ATGL)
Desco Infratech Business Update
Desco Infratech was empaneled by NREDCAP for solar rooftop PV projects up to 500 KWp in Andhra Pradesh. No specific work order has been awarded.
Other production started announcements
All →Waaree Energies Production Started
Waaree Solar Americas commenced commercial production of 1.6 GW solar modules at Brookshire, Texas. Total facility capacity now stands at 3.2 GW.
- solar module manufacturing capacity
- 1600 MW
Studds Accessories Production Started
Studds Accessories commenced commercial production at its Manufacturing Facility-V in Faridabad on October 30, 2026, after receiving Consent to Operate. No capacity or monetary value was disclosed.
NTPC Green Energy Production Started
NTPC Green Energy's subsidiary declared commercial operations for 95.6 MW of its Kalasar Solar Energy Project effective October 30, 2026.
- solar capacity
- 95.6 MW
NTPC Production Started
NTPC's subsidiary NVVN declared its first 250 MW / 500 MWh BESS project commercial from 27 October 2026, with power scheduling starting 28 October. This is a commercial operation start for a new energy storage asset.
- battery energy storage capacity
- 250.0 MW
DCM Shriram Production Started
DCM Shriram announced full commissioning of its ~68 MW wind-solar hybrid renewable power project. The project is held through SPV JSW Renew Energy Thirty Two Limited.
- wind-solar hybrid renewable power capacity
- 68.0 MW
Subros Production Started
Subros commenced commercial production at its new greenfield HVAC and Hose & Tubes plant. The 4.5 lakh units/annum capacity required ₹150 Crore investment.
- Value
- ₹150.0 Cr
- HVAC and Hose & Tubes / air-conditioning system production capacity
- 450000 units per annum