Free account
Sign up free to keep reading
Readers on your network have used today's free pages. Create a free ALFA Finder account to open this filing and every filing, result and earnings call on ALFA Filings and ALFA News.
Already have an account? Log in
- Free to join
- Sign up with Telegram in a minute
- 15-day free trial of our alerts
BSE filing, NSE: BRAHMINFRA. Summary written from the filing by ALFA Finder's alert engine.
Brahmaputra Infrastructure Ltd: key numbers
- Share price
- ₹166.80
- Market cap
- ₹484.0 Cr
- Revenue (annual)
- ₹365.5 Cr
- Net profit (annual)
- ₹59.58 Cr
- P/E (TTM)
- 7.3×Sector 34.0×
- Promoter holding
- 74.05%+0.00% QoQ
- FII holding
- 0.00%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Brahmaputra Infrastructure Ltd
All →Brahmaputra Infrastructure Bags ₹6.61 Cr Order from National Highways Logistics Management Limited
Brahmaputra Infrastructure emerged as H1 bidder for a 24-acre wayside site on the DAK Expressway from NHLML. Annual lease rent is Rs. 6.61 Crores over 30 years.
- Value
- ₹6.61 Cr
- From
- National Highways Logistics Management Limited (NHLML)
- Execution
- 30 years lease period from Appointed Date
- land area for wayside amenities site
- 9.7 hectares
Brahmaputra Infrastructure Bags ₹16.06 Cr Order from National Highways Authority of India, Regional Office – Guwahati
Brahmaputra Infrastructure received a Rs. 16.06 Crore EPC contract from NHAI for NH-27 bridge and road construction in Assam. Execution is 18 months from the appointed date.
- Value
- ₹16.06 Cr
- From
- National Highways Authority of India (NHAI), Regional Office – Guwahati
- Execution
- 18 months from the Appointed Date
Brahmaputra Infrastructure Earnings Call Transcript: Key Takeaways
Consolidated revenue rose 31% to ₹118 Cr; PAT ₹20–21 Cr (CEO and CFO figures differ). EBITDA margin eased to 23.3% from 24% YoY, partly from JV consolidation. Order book ₹2,000 Cr. Management's Q3–Q4 ramp claims are unquantified.
Brahmaputra Infrastructure Bags ₹89.73 Cr Order from Executive Engineer, Construction Division, PWD Branch, Pathankot,...
Brahmaputra Infrastructure JV won an Rs. 89.73 Crore bridge construction contract from Punjab PWD. The 44-span high-level bridge over River Ravi is due in 24 months.
- Value
- ₹89.73 Cr
- From
- Executive Engineer, Construction Division, PWD (B&R) Branch, Pathankot, Government of Punjab (CRIF Scheme)
- Execution
- 24 months from date of commencement / appointed date
Brahmaputra Infrastructure Investor Presentation: Key Takeaways
Q2FY27 consolidated revenue ₹118 Cr (+31% YoY), EBITDA ₹27 Cr (+23%), PAT ₹20 Cr (+37%). ₹317 Cr order wins; strategy shifts toward recurring real-estate income.
Brahmaputra Infrastructure Q2 FY27 Results: Net Profit ₹20.1 Cr, Up 37.7% YoY
Brahmaputra Infrastructure Ltd reported revenue from operations of ₹118.1 Cr (+30.9% YoY) and net profit of ₹20.1 Cr (+37.7% YoY) for Q2 FY27.
- Key figure
- Net profit ₹20.1 Cr · +37.7% YoY
Other new order win announcements
All →Jindal Drilling & Industries Bags New Order from Oil & Natural Gas Corporation Ltd.
Jindal Drilling received two ONGC awards to deploy rigs Jindal Star and Virtue-I for three years each. The filing does not disclose an aggregate contract value.
- From
- Oil & Natural Gas Corporation Ltd. (ONGC)
- Execution
- 3 years (each rig)
Ameenji Rubber Bags ₹4.67 Cr Order from South Eastern Railway
Ameenji Rubber received a Rs 4.67 Crore purchase order from South Eastern Railway for rubber pads. Execution is due within five months.
- Value
- ₹4.67 Cr
- From
- South Eastern Railway
- Execution
- 05 Months
RailTel Corporation of India Bags ₹145.8 Cr Order from Cste/Project/West, Northern Railway
RailTel received a Rs. 145.75 Crore order from Northern Railway for IP-MPLS and VOIP network provisioning. The project must be executed by November 26, 2027.
- Value
- ₹145.8 Cr
- From
- Cste/Project/West, Northern Railway
- Execution
- 12 months from date of LoA (execution by 26-Nov-2027)
Kay Cee Energy & Infra Bags ₹27.14 Cr Order from Aakshya Infra Projects Pvt. Ltd.
Kay Cee Energy won a Rs 27.14 Crore order from Aakshya Infra Projects for a Mumbai transmission line. Scope includes supply, erection and commissioning.
- Value
- ₹27.14 Cr
- From
- Aakshya Infra Projects Pvt. Ltd.
- Execution
- As per the terms of the LOA; timely-completion bonus applies for completion within six months
Seamec Bags ₹36.79 Cr Order from M/s. Adsun Offshore Diving Contractors Pvt. Ltd.
Seamec Limited awarded Adsun Offshore Diving Contractors a Rs.36.79 Crore diving services contract. Work covers pipeline replacement for the 2026-27 working season.
- Value
- ₹36.79 Cr
- From
- M/s. Adsun Offshore Diving Contractors Pvt. Ltd.
- Execution
- Working Season 2026-27
Artefact Projects Bags ₹3.07 Cr Order from National Highways Authority of India
Artefact Projects was awarded a Rs 3.07 Crore engineering services contract by NHAI for the Orai-Bara NH-25 section. The execution period is 36 months.
- Value
- ₹3.07 Cr
- From
- National Highways Authority of India
- Execution
- 36 Months