Thursday, 29 October 2026 Every NSE & BSE announcement, by company
ALFA Filings Every announcement, straight from the exchange
New Order Win

Brahmaputra Infrastructure Bags ₹114.2 Cr Order

Brahmaputra Infrastructure's JV was declared L-1 bidder for a ₹114.24 Crore railway bridge project. The 18-month contract strengthens its order book visibility and railway sector footprint.

Key figures
Value₹114.2 Cr
Execution period18 Months from the date of formal award
Source

BSE filing, NSE: BRAHMINFRA. Summary written from the filing by ALFA Finder's alert engine.

Read the filing ↗

Brahmaputra Infrastructure Ltd: key numbers

Share price
₹165.65
Market cap
₹480.7 Cr
Revenue (annual)
₹365.5 Cr
Net profit (annual)
₹59.58 Cr
P/E (TTM)
7.9×Sector 31.3×
Promoter holding
74.05%+0.00% QoQ
FII holding
0.00%Current quarter

Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.

More from Brahmaputra Infrastructure Ltd

All →
11:24 IST BSE
New Order Win

Brahmaputra Infrastructure Bags ₹89.73 Cr Order from Chief Engineer, Punjab PWD, Patiala, Government of Punjab

Brahmaputra Infrastructure's JV received a Rs. 89.73 Crore LOA from Punjab PWD for a 1,606 m bridge over River Ravi. Execution period is 24 months.

Value
₹89.73 Cr
From
Chief Engineer (Central), Punjab PWD (B&R), Patiala, Government of Punjab
Execution
24 months
14:41 IST BSE
New Order Win

Brahmaputra Infrastructure Bags ₹89.73 Cr Order from Office of the Executive Engineer, Construction Division, PWD B&R...

Brahmaputra Infrastructure declared L-1 for a Rs. 89.73 Crore bridge project over River Ravi in Punjab. Execution period is 24 months under the CRIF Scheme.

Value
₹89.73 Cr
From
Office of the Executive Engineer, Construction Division, PWD B&R Branch, Pathankot
Execution
24 months from date of receipt of LOI/LOA
11:44 IST BSE
New Order Win

Brahmaputra Infrastructure Bags ₹46.63 Cr Order from Northeast Frontier Railway

Brahmaputra Infrastructure signed a Rs.46.63 Crore contract with Northeast Frontier Railway for a Road Over Bridge. Work deadline is August 2027 with a 48-month defect liability period.

Value
₹46.63 Cr
From
Northeast Frontier Railway (Ministry of Railways, Government of India)
Execution
On or before 08.08.2027, plus 48-month defect liability period

Other new order win announcements

All →
00:34 IST BSE
New Order WinACME Solar Holdings Ltd ACMESOLAR

ACME Solar Holdings Bags New Order from NTPC Limited

ACME Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project. Supply is scheduled to start by June 2028, with a 25-year tenure.

From
NTPC Limited
Execution
Scheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD
FDRE power project contracted capacity
400.0 MW
17:51 IST BSE
New Order WinOriental Rail Infrastructure Ltd ORIRAIL

Oriental Rail Infrastructure Bags ₹630.6 Cr Order from Ministry of Railways, Indian Railways

Oriental Rail Infrastructure received a Ministry of Railways order to manufacture and supply 1,560 BOXNS wagons. The order is valued at about ₹630.61 Crore, inclusive of GST.

Value
₹630.6 Cr
From
Ministry of Railways (Railway Board), Indian Railways
Execution
Delivery period for the additional 360 BOXNS wagons up to June 11, 2027; the core 1,560-wagon supply period is not separately stated