| Value | ₹81.98 Cr |
|---|---|
| Execution period | 18 Months from the date of formal award |
BSE filing, NSE: BRAHMINFRA. Summary written from the filing by ALFA Finder's alert engine.
Brahmaputra Infrastructure Ltd: key numbers
- Share price
- ₹165.65
- Market cap
- ₹480.7 Cr
- Revenue (annual)
- ₹365.5 Cr
- Net profit (annual)
- ₹59.58 Cr
- P/E (TTM)
- 7.9×Sector 31.3×
- Promoter holding
- 74.05%+0.00% QoQ
- FII holding
- 0.00%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Brahmaputra Infrastructure Ltd
All →Brahmaputra Infrastructure Board Meeting Date
Brahmaputra Infrastructure scheduled a board meeting on 2 November 2026 to approve unaudited September-quarter and half-yearly results. Trading window closed from 1 October 2026.
Brahmaputra Infrastructure Other Announcement
Brahmaputra Infrastructure Ltd. has filed its quarterly compliance certificate under Regulation 74(5) of the SEBI (Depositories and Participants) Regulations, 2018 for the period ended September 30, 2026.
Brahmaputra Infrastructure Bags ₹89.73 Cr Order from Chief Engineer, Punjab PWD, Patiala, Government of Punjab
Brahmaputra Infrastructure's JV received a Rs. 89.73 Crore LOA from Punjab PWD for a 1,606 m bridge over River Ravi. Execution period is 24 months.
- Value
- ₹89.73 Cr
- From
- Chief Engineer (Central), Punjab PWD (B&R), Patiala, Government of Punjab
- Execution
- 24 months
Brahmaputra Infrastructure Bags ₹89.73 Cr Order from Office of the Executive Engineer, Construction Division, PWD B&R...
Brahmaputra Infrastructure declared L-1 for a Rs. 89.73 Crore bridge project over River Ravi in Punjab. Execution period is 24 months under the CRIF Scheme.
- Value
- ₹89.73 Cr
- From
- Office of the Executive Engineer, Construction Division, PWD B&R Branch, Pathankot
- Execution
- 24 months from date of receipt of LOI/LOA
Brahmaputra Infrastructure Bags ₹46.63 Cr Order from Northeast Frontier Railway
Brahmaputra Infrastructure signed a Rs.46.63 Crore contract with Northeast Frontier Railway for a Road Over Bridge. Work deadline is August 2027 with a 48-month defect liability period.
- Value
- ₹46.63 Cr
- From
- Northeast Frontier Railway (Ministry of Railways, Government of India)
- Execution
- On or before 08.08.2027, plus 48-month defect liability period
Brahmaputra Infrastructure Other Announcement
Brahmaputra Infrastructure Limited received approval from the Registrar of Companies to extend its 28th Annual General Meeting deadline to December 31, 2026.
Other new order win announcements
All →ACME Solar Holdings Bags New Order from NTPC Limited
ACME Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project. Supply is scheduled to start by June 2028, with a 25-year tenure.
- From
- NTPC Limited
- Execution
- Scheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD
- FDRE power project contracted capacity
- 400.0 MW
Zaggle Prepaid Ocean Services Bags New Order from AGP City Gas Private Limited
Zaggle Prepaid Ocean Services will provide its Zaggle Propel platform to AGP City Gas under a one-year agreement. Fees depend on active users and redeemed vouchers, so no contract value is disclosed.
- From
- AGP City Gas Private Limited
- Execution
- 1 year
Vascon Engineers Bags ₹72 Cr Order from Neobridge Realty LLP
Vascon Engineers received a Letter of Intent worth Rs.72 Crore from Neobridge Realty LLP. The 25-month construction contract covers the Astoria residential project in Bandra, Mumbai.
- Value
- ₹72.00 Cr
- From
- Neobridge Realty LLP
- Execution
- 25 months
Transteel Seating Technologies Bags ₹0.26 Cr Order from 315 Work Avenue Spaces Private Limited
Transteel Seating won a Rs 26.12 lakh furniture supply and installation order from 315 Work Avenue Spaces. Execution is due within one week.
- Value
- ₹0.26 Cr
- From
- 315 Work Avenue Spaces Private Limited
- Execution
- Within 1 week from the date of work order
Aptech Bags ₹3.21 Cr Order from Autonomous Government Body
Aptech received a Rs.3.21 Crore order from an autonomous government body to conduct online examinations. Service runs from 1 January 2027 to 31 December 2027.
- Value
- ₹3.21 Cr
- From
- Autonomous Government Body (name not disclosed)
- Execution
- 1 January 2027 to 31 December 2027
Oriental Rail Infrastructure Bags ₹630.6 Cr Order from Ministry of Railways, Indian Railways
Oriental Rail Infrastructure received a Ministry of Railways order to manufacture and supply 1,560 BOXNS wagons. The order is valued at about ₹630.61 Crore, inclusive of GST.
- Value
- ₹630.6 Cr
- From
- Ministry of Railways (Railway Board), Indian Railways
- Execution
- Delivery period for the additional 360 BOXNS wagons up to June 11, 2027; the core 1,560-wagon supply period is not separately stated