| Value | ₹2.89 Cr |
|---|---|
| Execution period | 12 months |
BSE filing, NSE: BCPL. Summary written from the filing by ALFA Finder's alert engine.
BCPL Railway Infrastructure Ltd: key numbers
- Share price
- ₹65.80
- Market cap
- ₹110.0 Cr
- Revenue (annual)
- ₹210.2 Cr
- Net profit (annual)
- ₹6.44 Cr
- P/E (TTM)
- 13.3×Sector 31.3×
- Promoter holding
- 72.86%+0.00% QoQ
- FII holding
- 0.00%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from BCPL Railway Infrastructure Ltd
All →BCPL Railway Infrastructure Board Meeting Date
BCPL Railway Infrastructure intimates a board meeting on 05 Nov 2026 to consider unaudited standalone and consolidated results for the quarter and half year ended September 30, 2026. The trading window stays closed until 48 hours after results.
BCPL Railway Infrastructure Other Announcement
BCPL Railway Infrastructure Ltd filed a Regulation 74(5) compliance certificate for the quarter ended September 30, 2026. The RTA confirmed no dematerialisation requests were processed.
BCPL Railway Infrastructure Bags ₹37.27 Cr Order from Eastern Railway
BCPL Railway Infrastructure Ltd secured an order worth ₹37.27 Crore from Eastern Railway for TRD works in the Waria-Raniganj section. The project spans 12 months.
- Value
- ₹37.27 Cr
- From
- Eastern Railway
- Execution
- 12 months
BCPL Railway Infrastructure Merger & Restructuring
BCPL Railway Infrastructure Limited has incorporated AJU Real Estate Private Limited as a wholly-owned subsidiary. The new entity will focus on real estate consultancy and advisory services.
BCPL Railway Infrastructure Bags ₹6.22 Cr Order from Eastern Railway
BCPL Railway Infrastructure Ltd secured a new Rs. 6.22 Crore order from Eastern Railway for Howrah division project works. Execution will span 18 months.
- Value
- ₹6.22 Cr
- From
- Eastern Railway
- Execution
- 18 months
BCPL Railway Infrastructure Merger & Restructuring
BCPL Railway Infrastructure Limited's board approved the incorporation of a new wholly owned subsidiary for real estate consultancy and advisory services.
Other new order win announcements
All →Dilip Buildcon Bags ₹688.2 Cr Order from National Highways Authority of India
Dilip Buildcon received a Rs. 688.23 Crore LOA from NHAI for a 9.66 km Solapur elevated corridor. Construction spans 24 months with a 15-year operation period.
- Value
- ₹688.2 Cr
- From
- National Highways Authority of India
- Execution
- 24 Months (construction) + 15 years (operation from COD)
- elevated corridor length
- 9.66 km
Jupiter Wagons Bags ₹1,140 Cr Order from Ministry of Railways
Jupiter Wagons secured an order for 2,583 BOXNHL and BOXNS wagons worth ₹1,140 crore from the Ministry of Railways. This reinforces its position in railway rolling stock manufacturing.
- Value
- ₹1,140 Cr
- From
- Ministry of Railways (Railway Board)
ACME Solar Holdings Bags New Order from NTPC Limited
ACME Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project. Supply is scheduled to start by June 2028, with a 25-year tenure.
- From
- NTPC Limited
- Execution
- Scheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD
- FDRE power project contracted capacity
- 400.0 MW
Zaggle Prepaid Ocean Services Bags New Order from AGP City Gas Private Limited
Zaggle Prepaid Ocean Services will provide its Zaggle Propel platform to AGP City Gas under a one-year agreement. Fees depend on active users and redeemed vouchers, so no contract value is disclosed.
- From
- AGP City Gas Private Limited
- Execution
- 1 year
Vascon Engineers Bags ₹72 Cr Order from Neobridge Realty LLP
Vascon Engineers received a Letter of Intent worth Rs.72 Crore from Neobridge Realty LLP. The 25-month construction contract covers the Astoria residential project in Bandra, Mumbai.
- Value
- ₹72.00 Cr
- From
- Neobridge Realty LLP
- Execution
- 25 months
Transteel Seating Technologies Bags ₹0.26 Cr Order from 315 Work Avenue Spaces Private Limited
Transteel Seating won a Rs 26.12 lakh furniture supply and installation order from 315 Work Avenue Spaces. Execution is due within one week.
- Value
- ₹0.26 Cr
- From
- 315 Work Avenue Spaces Private Limited
- Execution
- Within 1 week from the date of work order